Skip to content
Civil Technologist

Civil Technologist

  • Home
  • Calculators
    • Concrete Calculator
    • Steel Bar Weight Calculator
    • Plaster Calculator
    • Bitumen Extraction Test Calculator
  • Tests & Labs
    • Concrete Lab
    • Geotechnical Lab
    • Soil Mechanics lab
    • Concrete Test
  • Civil Engineering Standards: Complete Guide
    • AASHTO
    • ACI
    • ASTM
    • NHA
    • British Standard
    • European standard (EN)
    • Indian Standard
  • Articles
    • Road
    • Building
    • Estimate
  • About Us

California Bearing Ratio (CBR) Test for Soil: Procedure and Calculation

California Bearing Ratio test apparatus with penetration plunger on compacted soil specimen and dial gauge in a geotechnical laboratory

Before a single layer of a road is laid, the designer asks one question about the ground beneath it: how …

Read more

Consolidation Test (Oedometer): Procedure, e–log p Curve & Settlement Calculation

Buildings on clay do not settle the day the last floor is cast. They settle slowly — over months and …

Read more

Speedy Moisture Tester: Procedure, Chart Reading & Worked Example

Compaction control lives or dies on moisture content. The oven-dry method is the reference standard, but it takes 16–24 hours …

Read more

Falling Head Permeability Test of Soil: Procedure, Formula & Worked Example

Falling Head Permeability Test of Soil: Procedure, Formula & Worked Example

How fast water moves through soil decides whether a foundation stays dry, a retaining wall survives, or an embankment dam …

Read more

Specific Gravity of Cement Test (Le Chatelier Flask Method)

Specific Gravity of Cement Test (Le Chatelier Flask Method)

Of all the cement tests, specific gravity is the quickest honesty check on a bag of cement. Fresh ordinary Portland …

Read more

Concrete Admixtures and Their Types — Dosage, Effects & Selection Guide

Concrete is cement, water, and aggregates — but on real projects it is rarely just those three. A small dose …

Read more

Older posts
Newer posts
← Previous Page1 … Page8 Page9 Page10 … Page13 Next →

Popular Article

  • V-Funnel Test for Self-Compacting Concrete: Procedure, Flow Time & Limits
  • Concrete Temperature: Limits, Measurement (ASTM C1064) and Hot/Cold Weather Practice
  • AI in Civil Engineering: Applications, Benefits and Challenges (2026 Update)
  • Subgrade Preparation for Achieving Compaction: Procedure, Equipment & Field Control
  • Load-Bearing Wall Design: Principles, Steps and Worked Calculation Example

Construction Calculators

Free estimation tools with step-by-step working:

  • 🧱 Brick Calculator
  • 🏗️ Cement Calculator
  • 🔩 Steel Bar Weight Calculator
  • 🧱 Plaster Calculator
  • 🟧 Tile Calculator
  • 🎨 Paint Calculator
  • 💧 Water Tank Calculator
  • 🏠 Land Area Converter
  • 🏗️ Concrete Calculator
  • 🛣️ Bitumen Extraction Calculator

View All Calculators →

Categories

Follow Us

Join our community:

▶ YouTube - Watch Tutorials f Facebook - Join Community in LinkedIn - Connect

  • Home
  • Privacy Policy
  • About Us
  • Contact
  • Disclaimer
  • Terms & Conditions
  • Sitemap
© 2022-2026 Civil Technologist