Drawings arrive in feet and inches, design codes work in millimetres and megapascals, the batching plant thinks in cubic metres, and the landowner talks in marlas. A civil engineer who cannot move between these systems quickly will make mistakes — usually expensive ones.
This is a complete, verified reference: conversion tables for every quantity you will meet on site, plus worked examples showing how the conversions are actually used.
Length

| From | To | Multiply by |
|---|---|---|
| 1 inch (in) | millimetres | 25.4 |
| 1 foot (ft) | metres | 0.3048 |
| 1 yard (yd) | metres | 0.9144 |
| 1 mile | kilometres | 1.60934 |
| 1 metre (m) | feet | 3.28084 |
| 1 kilometre (km) | miles | 0.62137 |
Key site facts: 1 m = 1000 mm = 100 cm; 1 ft = 12 in; 1 yd = 3 ft.
Area (Including Pakistani Land Units)
| From | To | Multiply by |
|---|---|---|
| 1 ft² | m² | 0.092903 |
| 1 yd² | m² | 0.836127 |
| 1 m² | ft² | 10.7639 |
| 1 acre | m² | 4046.86 |
| 1 acre | ft² | 43,560 |
| 1 hectare | m² | 10,000 |
| 1 hectare | acres | 2.47105 |
Pakistani land units (Punjab standard):
| Unit | Equals |
|---|---|
| 1 marla | 272.25 ft² = 25.29 m² |
| 1 kanal | 20 marla = 5,445 ft² = 505.86 m² |
| 1 acre | 160 marla = 8 kanal = 43,560 ft² |
| 1 murabba | 25 acres |
Worked example: A plot is 2 kanal. In square metres: 2 × 505.86 = 1,011.7 m². In marlas: 2 × 20 = 40 marla.
Volume
| From | To | Multiply by |
|---|---|---|
| 1 ft³ | m³ | 0.0283168 |
| 1 m³ | ft³ | 35.3147 |
| 1 yd³ | m³ | 0.764555 |
| 1 litre (L) | m³ | 0.001 |
| 1 litre | ft³ | 0.0353147 |
| 1 US gallon | litres | 3.78541 |
| 1 imperial gallon | litres | 4.54609 |
| 1 m³ | litres | 1,000 |
Key site facts: 1 m³ = 1000 L; a standard concrete mixer truck carries 6–8 m³. Discharge is also volume per time: 1 cusec (ft³/s) = 0.02832 m³/s.
Worked example: A footing needs 4.5 m³ of concrete. In cubic feet: 4.5 × 35.3147 = 158.9 ft³. In litres: 4.5 × 1000 = 4,500 L.
Mass
| From | To | Multiply by |
|---|---|---|
| 1 pound (lb) | kg | 0.453592 |
| 1 kg | lb | 2.20462 |
| 1 metric tonne | kg | 1,000 |
| 1 metric tonne | lb | 2,204.62 |
| 1 US (short) ton | kg | 907.185 |
| 1 maund (trade) | kg | 40 (Pakistan’s standard trade maund; the historical British imperial maund was 37.32 kg) |
Worked example: 1 m³ of normal concrete weighs about 2,400 kg = 2.4 tonnes = 2.4 × 2204.62 = 5,291 lb. This single number drives truck counts, crane picks, and dead-load estimates.
Rebar Weight (Used Daily on Site)
The weight of steel bars per metre follows one simple formula:
Weight (kg/m) = D² / 162, where D = bar diameter in mm
| Bar diameter | Weight per metre |
|---|---|
| 10 mm | 0.617 kg/m |
| 12 mm | 0.888 kg/m |
| 16 mm | 1.579 kg/m |
| 20 mm | 2.466 kg/m |
| 25 mm | 3.853 kg/m |
| 32 mm | 6.313 kg/m |
Worked example: A bar bending schedule calls for 85 m of 20 mm bars. Weight = 85 × 2.466 = 209.6 kg. The 162 in the denominator comes from the density of steel (7,850 kg/m³): it is exact enough for every site calculation. For lap length calculations using these bars, see the lap length guide.
Force
| From | To | Multiply by |
|---|---|---|
| 1 newton (N) | lbf | 0.224809 |
| 1 kilonewton (kN) | lbf | 224.809 |
| 1 kgf | N | 9.80665 |
| 1 tonne-force | kN | 9.80665 |
| 1 MN | kN | 1,000 |
Key fact: 1 kg of mass weighs 9.81 N on Earth. Site engineers often say “10 tonnes” when they mean a 98.1 kN load — fine for talk, but use proper force units in calculations.
Pressure and Stress (The Most-Used Table in Design)
| From | To | Multiply by |
|---|---|---|
| 1 N/mm² | MPa | 1 (exactly) |
| 1 MPa | psi | 145.038 |
| 1 psi | kPa | 6.89476 |
| 1 kg/cm² | MPa | 0.0980665 |
| 1 kg/cm² | psi | 14.2233 |
| 1 kPa | kN/m² | 1 (exactly) |
| 1 bar | MPa | 0.1 |
| 1 bar | psi | 14.5038 |
Worked example 1: A cylinder test gives 32 N/mm². In MPa: 32 MPa. In psi: 32 × 145.038 = 4,641 psi.
Worked example 2: A US specification calls for 3,000 psi concrete. In MPa: 3000 × 0.00689476 = 20.7 MPa — roughly equivalent to M20 grade.
Worked example 3: A soil bearing capacity of 150 kN/m² = 150 kPa = 150 × 0.145038 = 21.8 psi.
Density and Unit Weight
| From | To | Multiply by |
|---|---|---|
| 1 lb/ft³ | kg/m³ | 16.0185 |
| 1 g/cm³ | kg/m³ | 1,000 |
| 1 kg/m³ (mass density) | kN/m³ (unit weight) | ÷ 1,000 × 9.81 |
So concrete at 2,400 kg/m³ has a unit weight of 2,400 × 9.81 / 1,000 = 23.5 kN/m³ (commonly rounded to 24 kN/m³ in design). For the full list of material unit weights, see the unit weight guide.
Speed and Temperature
| From | To | Multiply by |
|---|---|---|
| 1 km/h | m/s | 0.277778 |
| 1 mph | km/h | 1.60934 |
| °C to °F | — | °F = °C × 9/5 + 32 |
| °F to °C | — | °C = (°F − 32) × 5/9 |
Worked example: Concrete temperature limit 35°C = 35 × 9/5 + 32 = 95°F.
Money and Counting (Pakistani Site Practice)
| Unit | Equals |
|---|---|
| 1 lakh | 100,000 |
| 1 crore | 10,000,000 (100 lakh) |
| 1 arab | 1,000,000,000 (100 crore) |
Practical Tips
- Keep mm and m straight. The single most common site arithmetic error is mixing millimetres and metres in one formula — a beam 300 mm wide is 0.3 m, not 300 m.
- Write the units in every calculation. If the units cancel correctly, the number is usually right.
- psi ↔ MPa shortcut: multiply psi by 0.007 for a quick mental MPa (≈ 3,000 psi ≈ 21 MPa).
- The D²/162 rule for rebar weight and the 2,400 kg/m³ concrete figure should be memorised — you will use them weekly.
- Land units vary by province — the marla above is the Punjab standard (272.25 ft²). Confirm the local standard before any transaction.
Frequently Asked Questions
How many marlas are in one acre?
160 marlas (Punjab standard). One acre = 8 kanal = 43,560 ft² = 4,046.86 m².
What is 1 N/mm² in psi?
1 N/mm² = 1 MPa = 145.04 psi.
How much does 1 cubic metre of concrete weigh?
About 2,400 kg, or 2.4 metric tonnes (23.5 kN/m³).
What is the formula for rebar weight per metre?
Weight (kg/m) = D²/162, where D is the bar diameter in millimetres. A 20 mm bar weighs 2.466 kg/m.
Final Thoughts
Bookmark this page — unit conversion is one of those skills that quietly underpins every estimate, every test result, and every drawing you read. When a conversion feeds into a structural calculation, double-check it; when it feeds into a purchase order, triple-check it.
Written by Mohsin Raza Adil — BSc Civil Engineering Technologist (NTC-registered), Pakistan.